Contracts

There are currently no WORD contracts posted for bid,
but they will be posted here if there are any available.

Cleanup Contracts

Cleanup contracts are awarded on a one-year basis. The WORD Board of Directors has the option to renew a cleanup contract up to a total of 3 years. Currently, there are no WORD cleanup contracts posted for bid, but they will be posted above if there are any available.

Contract #1: Boat Ramps

AREA: Nine County Boat Ramps: #1, #2, #5, #6, #7, #8, #11, #22, and #23

FREQUENCY: Twice a week from May 15, 2019 to September 15, 2019, and one time a month January through April, and October through December.

Contract #2: FM 306 Roadside

AREA: One half mile east of Bridge at Whitewater Sports/ Highway 306 to one half mile west of Bridge at Maricopa Lodge/ Highway 306

FREQUENCY: Once a week from May 15, 2019 to September 15, 2019. Additional offseason or as-needed cleanups may be scheduled by WORD.

Contract #3: River Road Roadside

AREA: Loop 337 at River Road to FM 2673 at River Road

FREQUENCY: Once a week from May 15, 2019 to September 15, 2019. Additional offseason or as-needed cleanups may be scheduled by WORD.

Contract #4: Upper Guadalupe River Cleanup

AREA: Section of Guadalupe River from Guadalupe State Park to Rebecca Creek Crossing

FREQUENCY: Up to nine full cleanups shall be performed from May 15, 2019 to September 15, 2019. In addition, up to 3 off season shall be completed.

Contract #5: Lower Guadalupe River Cleanup A

AREA: Section of Guadalupe River from Canyon Dam to 2nd Crossing Bridge

SCHEDULE: From May 15, 2019 to September 15, 2019

  • Canyon Dam to the first Horseshoe Bridge: Bi-weekly
  • FM 306 Horseshoe 1st Bridge to 4th Crossing Bridge: 3 times per week
  • 4th Crossing Bridge to 3rd Crossing Bridge: Twice Weekly
  • 3rd Crossing Bridge to 2nd Crossing Bridge: Twice Weekly

Barrels will be placed at the Horseshoe entrances and exits, and will be service a minimum of 5 times a week. Contract shall also provide a staff member on Saturday to service barrels.

In addition, up to two off-season cleanups shall be performed.

Contract #6: Lower Guadalupe River Cleanup B

AREA: Section of Guadalupe River from 2nd Crossing Bridge to Preiss Heights Railroad Bridge within Comal County.

FREQUENCY: Twice a week from May 15, 2019 to September 15, 2019. In addition, up to 2 off-season cleanups shall be performed.

Barrels will be placed at the River Oaks POA River Park and River Forest POA Park and will be service a minimum of 3 times a week.

In addition, up to 2 off-season cleanups shall be performed

Contract #7: Overlook Park

AREA: Canyon Lake shoreline and surrounding area beginning at Canyon Lake Dam and running approximately 1/2 mile to a point of 500 feet past second walking trail that comes down from the Park itself.

FREQUENCY: Barrels and shoreline will be serviced three times a week from May 1st, 2019 to September 30th, 2019.

Contract #8: SCUBA

AREA: Various points on the Guadalupe River

FREQUENCY: Once a month from May to September.

Contract #9: As Needed Roadside

AREA: Roadside areas within the Comal County WORD District as determined by WORD on an as-needed basis.

FREQUENCY: One time cleanups shall be performed as determined by WORD on any stretch of TXDOT or County roadways within WORD.

Upcoming Events

Wed 18

Board Meeting – CANCELED

December 18 @ 5:30 pm - 7:30 pm
Tue 24
Wed 25
Jan 07

Flood Siren Testing

Jan 7, 2020 @ 10:00 am - 11:00 am
Feb 04

Flood Siren Testing

Feb 4, 2020 @ 10:00 am - 11:00 am